×

Project contents: project design, EPC and BOT

Design capacity: the municipal sewage disposal capacity is 40,000 t/d for Phase-I Project and Phase-II Project respectively.

Operation time: the Phase-I Project was put into operation in August 2003, and the Phase-II Project is expected to be put into operation in December 2014.

国产性生大片免费观看性|8050网午夜一级毛片|人人爱人人操人人摸|欧美裸体xxxxbbbb极品|亚洲AⅤ中文无码字幕色下载软件