×

ENFI’s subsidiary company Xiangyang Environment Protection and Energy Co., Ltd. adopts BOT model for this project. The operation period of this project is 30 years (including the construction period). This project uses grate furnaces, waste heat boiler and semi-dry offgas treatment process. After reaching the design capacity, the waste disposal capacity is 1200t/d.

This project was put into operation in March 2012.

国产性生大片免费观看性|8050网午夜一级毛片|人人爱人人操人人摸|欧美裸体xxxxbbbb极品|亚洲AⅤ中文无码字幕色下载软件