The four BOT-based garbage incineration power generation projects invested and built by ENFI are located in Wuxi, Xiangyang, Harbin and Ganzhou respectively with cumulative daily waste disposal capacity of 5,600 tons. Furthermore, ENFI has completed the engineering design for over 30 garbage incineration power generation projects. Among them, 20 projects have a production capacity exceeding 1,000 tons. These projects are distributed in more than 20 cities in China, and their total daily waste disposal capacity exceeds 30,000 tons which accounts for 20% of the total garbage treatment capacity of constructed garbage treatment projects in China.
Rich engineering experience
BOT Projects
No.
Location of construction site
Name of project
Capacity
Mode
Remarks
1
Guangdong
Shenzhen Bao’an Laohukeng Domestic Garbage Incineration Power Plant (phase II)
3000t/d,4×750t/d, 2×30MW generator units
Consultation
Put into production in 2012
Shenzhen Baigehu Domestic Garbage Incineration Power Plant
1200t/d,3×400t/d, 2×15MW generator units
Consultation and design
Under construction
2
Hebei
Qinhuangdao Domestic Garbage Incineration Power Plant
1000t/d,2×500t/d, 2×9MW generator units
Consultation and design
Put into production in 2010
3
Hubei
Wuhan Hanyang Guodingshan Domestic Garbage Incineration Power Plant
1500t/d,3×500t/d, 2×20MW generator units
Consultation and design
Put into production in 2013
4
Jiangsu
Yangzhou Domestic Garbage Incineration Power Plant (phase I)
1000t/d,2×500t/d, 2×10MW generator units
Consultation and design
Put into production in 2010
Yangzhou Domestic Garbage Incineration Power Plant (phase II)
1×610t/d, 1×12MW generator units
Under construction
Yixing Domestic Garbage Incineration Power Plant
500t/d, 2×250t/d, 1×9MW generator units
Put into production in 2007
Wuxi Huilian Domestic Garbage Incineration Power Plant
1200t/d,3×400t/d, 2×12MW generator units
Put into production in 2006
Suzhou Domestic Garbage Incineration Power Plant (phase I)
1050t/d,3×350t/d, 2×9MW generator units
Design
Put into production in 2006
Suzhou Domestic Garbage Incineration Power Plant (phase II)
1000t/d,2×500t/d, 1×20MW generator units
Consultation and design
Put into production in 2008
5
Liaoning
Dalian Domestic Garbage Incineration Power Plant
1500t/d,3×500t/d, 2×12MW generator units
Consultation and design
Put into production in 2012
6
Shandong
Jinan Domestic Garbage Incineration Power Plant
2000t/d,4×500t/d, 2×18MW generators
Consultation and design
Put into production in 2011
Linyi Domestic Garbage Incineration Power Plant
800t/d,2×400t/d, 1×25MW generator units
Put into production in 2008
7
Sichuan
Chengdu Xiangfu Domestic Garbage Incineration Power Plant
1800t/d,3×600t/d, 2×18MW generator units
Consultation and design
Put into production in 2012
Chengdu Luodai Urban Domestic Garbage Incineration Power Plant
1200t/d,3×400t/d, 2×12MW generator units
Put into production in 2008
8
Tianjin
Tianjin Guanzhuang Domestic Garbage Incineration Power Plant
1000t/d, 2×500t/d,2×10MW generator units
Consultation and design
Under construction
9
Yunnan
Qujing Domestic Garbage Incineration Power Plant
800t/d, 2×400t/d, 2×12MW generators
Consultation and design
Put into production in 2010
10
Zhejiang
Ningbo Fenglin Domestic Garbage Incineration Power Plant
1050t/d, 3×350t/d, 2×6.8MW generator units
Consultation and design
Put into production in 2001
Wenzhou Yongqiang Domestic Garbage Incineration Power Plant
900t/d, 4×225t/d, 2×7.5MW generator units
Design
Put into production in 2003
11
Hainan
Haikou Domestic Garbage Incineration Power Plant Expansion Project
1200t/d,2×600t/d, 2×12MW generator units
Design
Under construction
12
Shanxi
Shanxi Jincheng Domestic Garbage Incineration Power Plant